
Network cabinet rebuild · anonymised project
A cabinet rebuild, before and after
The same network cabinet before and after: three UniFi switches, neat short patch leads and everything labelled.
- NovaSoft’s contribution
- Rebuilding the cabinet, organising patching, fibre termination, VLAN separation and a 10GbE server connection.
- Scope of the story
- These photographs document this cabinet rebuild. Client details are kept private; the original migration is a separate project.



